QuayQuip has worked closely with the Australian firm McConnell Dowell to supply the ideal fender systems for Holcim Jetty in Tuban, Indonesia. The 800m cement facility jetty will be complete by the end of February 2014, ready for immediate entry into service.

An exposed berth, the main 200m platform stands some 600m off the coastline at Holcim. Twenty sets of paired QME Element fenders are divided between both jetty surfaces. The fender elements are 1250mm high by 1500mm long and stand behind closed-box, UHMW-PE faced steel panels that measure 5.1m high by 2m wide. Sixteen 500kN T-Head Bollards were also supplied.