Fenders installed at E-Ferry Terminal in Faaborg

QuayQuip has been awarded the project to design and supply all fender systems for this prestigious project. The first fenders at Søby Ferry Port in Faaborg are installed, and the new electric ferry can now berth.

This design – and installation was challenging due to the fact that no single fender system is the same. QuayQuip, working together with the contractor and the consultant managed to make a suitable design which was approved, manufactured, shipped and installed within the desired time frame.

This successful project confirms QuayQuip’s strong position in Denmark, as well as the rest of Scandinavia.

Previous
Next

Comments are closed.